Metallurgy

 

Plant in Linz (A)

Customer: VOEST Alpine AG

Key data:

  • Blast furnace A gas injection
  • Completion: 2010

Scope:

  • Detail engineering using EPLAN21/PPE
  • Software requirements specification, programming logic and control images using automation system PCS7
  • Simulation and software test with WinMod
  • Instrumentation installation
  • Loop test and hard & software commissioning
 

Plant in Krefeld (D)

Client: Siemens VAI GmbH

Customer: Thyssen Krupp Nirosta

Key data:

  • Revamp of 2*96 to AOD-Converter plant
  • Completion: 2009

Scope:

  • Erection engineering and delivery of installation material
  • Installation of the complete electrical, instrumentation and control technical equipment
  • Loop test and commissioning
 

Plant in Linz (A)

Customer: VOEST Alpine AG

Key data:

  • Slabs turner manipulator
  • 4,2m Quarto Heavy Plate
  • Completion: 2012

Scope:

  • Process automation system PCS7
  • Hard- and Softwareengineering, Documentation
  • Erection engineering
  • Delivery of energy supply, 6 kV, 400 V , 500 V
  • Installation of the complete electrical, instrumentation and control technical equipment
  • Loop test and commissioning
 
 
 
&nbp;